November 21, 2019 / 08:24 (GMT+7)
Jakarta, Indonesia

 MMD Mineral Sizing
   :: MMD Series
   :: MMD Apron Plate Feeders
   :: MMD Sizing Stations
 Hagglunds Drives
 Denison Hydraulics
 BMS International
 International Network of  Suppliers
   :: Coal
 
 PT. Pahmi Engineering

 Jakarta Office:
 Menara Prima, level 27th D
 Jl. Lingkar Mega Kuningan
 Jakarta - Indonesia
 Phone : +62 21 7591 7063
 Fax : +62 21 7591 7064
 Email : sales@pahmigroup.com
 Email : gbellpahmi@gmail.com


 Padang Office:
 Jl. Raden Saleh No. 54
 Phone : +62 751 442087
 Fax : +62 751 442097

Call us!

PT. PAHMI GROUP

Business Scope
Coal mining and trading

REPRESENTATIVE OFFICE
PT. Pahmi Group
Menara Prima Level 27th D
Jl. Lingkar Mega Kuningan
Indonesia
Phone: +62 21 7591 7063
Fax: +62 21 7591 7064
E-mail: sales@pahmigroup.com

Direct Contact:
Mr. Graham Bell. Mobile +62 812 670 8847

Mining / Site Location
Tani Jaya Murni, KM 22, KM 33, KM 37, Lokhwihang, Asam asam, Kintap. Gunung Barong, Rantau Nangka, Desa Lima, Binuang, Rantau, Mangkal Api, Sehapi, Serongga South Kalimantan.





View Larger Map

 

PRODUCT INFORMATION

High Calorie

 

      

Total Moisture (ARB)

15 % Max.

 

Inherent Moisture (ADB)

6 - 10 % Approx.

 

Ash Content (ADB)

15 % Max.

 

Volatile Matter (ADB)

38 % - 42 %

 

Fixed Carbon (ADB)

By Difference.

 

Total Sulfur (ADB)

1 % Max.

 

Hard Grove Index (HGI)

38 - 44

 

Size

ROM

 

Gross Calorific Value (ADB)

6,300 up Kcal/Kg.

 

 

 

Middle Calorie

 

 

      

Total Moisture (ARB)

17 % Max.

 

Inherent Moisture (ADB)

10 - 13 % Approx.

 

Ash Content (ADB)

11 % Max.

 

Volatile Matter (ADB)

37 % - 41 %

 

Fixed Carbon (ADB)

By Difference.

 

Total Sulfur (ADB)

0.9 % Max.

 

Hard Grove Index (HGI)

45 - 49

 

Size

ROM

 

Gross Calorific Value (ADB)

6,100 up Kcal/Kg.

 

 

 

Low Calorie

 

 

       

Total Moisture (ARB)

32 % Max.

 

Inherent Moisture (ADB)

15 - 17 % Approx.

 

Ash Content (ADB)

7 % Max.

 

Volatile Matter (ADB)

35 % - 38 %

 

Fixed Carbon (ADB)

By Difference.

 

Total Sulfur (ADB)

0.6 % Max.

 

Hard Grove Index (HGI)

50 - 55

 

Size

ROM

 

Gross Calorific Value (ADB)

5,800 up Kcal/Kg.

 


License Background
Pahmi Coal was established on 2000, with core business of coal mining and trading with affiliation to coal concession owner at South Kalimantan as coal mining project under license scheme of Kuasa Pertambangan (Coal Concession) as domestic investment which concession was signed on 2000 under rules of local government (Bupati) as chief of district area.

Stockpile Location and Capacity
Stockpile at DTBS Pandansari, Kintap, Tanah Laut district. Stockpile at Pulorida Quarindo Serongga district. Stockpile at km 94 CPB, CV.ARIF, PBM at Tapin, Binuang District. Stockpile at km 74 and km 63 of Kab. Banjar



Crushing Plan & Capacity
The three crushing plants at CENKO stockpile is 300 MT per hour along or equal 300,000 MT per month. The capacity of the stockpile is 300,000 MT consist of 100,000 MT ROM (Run Of Mining) and 200,000 MT of the crushed coal. The Four crushing plan at KPP jetty Sei Puting is 350 MT per hour along for jetty "J", jetty K is 1200 MT per hour, jetty H is 350 MT per hour, jetty O is 400 MT per hour equal 120,000 MT per month. The capacity of the jetty is 400,000 MT consist of 250,000 MT ROM and 150,000 MT of the crushed coal.


Port of Loading & Capacity

CENKO's stockpile including port facility for major coal from Tani Jaya Murni, KM 22, KM 33, KM 37, Lokhsihang, Asam-asam, Kintap. The port has 2 jetties for each 8,000 MT barge 300 feet with conveyor system and truck closing, Jetty KPP including port facility for major coal from Binuang area especially KPP, BGM, CPB. The port has 4 jetty for each 8000 & 10,000 MT barge feet with conveyor system only.


Distance mine to crushing plan / Loading port
The distances between mine area to crushing plan / loading port (CENKO) is approx 15 km - 40 km, distances between mine at Mangkalapi area to crushing plan / loading port (APTS) is approx 50 km, and distances between mine at Dasakarya and Intan Karya Mandiri of Kab. Banjar area to crushing plan / loading port (PQ) is approx 10 km - 70 km.

Trans-Shipment Point and Capacity
Taboneo anchorage open sea is loading point for SPAJ port at Tanah Laut district, and Tanjung Pemancingan anchorage open sea is loading point for APTS port at Sungai Danau district. The Vessel capacity trans-shipment open sea capacity is 30,000 MT to 120,000 MT.

Distance to Trans-Shipment Point
Port to trans-shipment point is around 16 - 18 nautical miles (knot) or around 8 - 10 hour barge 300 feet sailing.

Floating Crane Facility
Usually the Panamax or Handymax vessels are gearless equipment. Floating crane facility must be ready for load around at least 1 million MT coal per year. For the long contract, this facility is very urgent. There are 3 biggest shipping companies in Indonesia for supporting floating crane facility.

Independent Surveyor
A quality control laboratory and final quantity conducts by independent surveyor like SUCOFINDO, CARSURIN or GEOSERVICES, CCI correspondents of SGS, Geneva at loading point (vessel).


Insurance
The International insurance I.E Ing insurance, AIA insurance, Lloyd could be protected all risk the marine cargo ocean going to destination port.
We can accomodate most rqueirements - Please Contact us for a Comprehensive quotation.


Copyright @ 2008, PT. Pahmi Engineering